Due to the removal of the right soil, the stress is released, the measuring point moves to the right, and the curve is in an increasing trend.
← all excerpts
Numerical analysis and application of the construction method for the small interval tunnel in the turn line of metro.
2
—
—
The sentences
The peak deformation of CDK0+214∼CDK0+264 in the section shows a decreasing trend, and the peak measuring point is almost stable near the axis position of the main tunnel; the deformation value of the measured data of each monitoring section is almost settled.