According to the optimization results in Table 8 , the MGs at 15%, 25%, 30% (baseline), and 35% MT startup limits demonstrate an increasing trend of TNPC and LPSP while decreasing in the GEM, indicating a drop in cost and power supply reliability.
← all excerpts
Optimal performance of stand-alone hybrid microgrid systems based on integrated techno-economic-environmental energy management strategy using the grey wolf optimizer.
1
—
—