During the intermittent period, the stress of the soil between piles shows a slightly decreasing trend, and the soil stress at the top of the piles shows a slightly increasing trend, indicating that the soil arch has been formed at this height and the soil stress between the piles has been transferred to the top of the pile.
← all excerpts
Study on load transfer mechanisms and impact on adjacent railway subgrade within loess regions.
1
—
—