Column (3) shows the results of the instrumental variable model, where there is a highly significant coefficient between the instrumental variable and the high-speed rail opening variable.
← all excerpts
Transportation infrastructure and economic growth: Evidence from "new nighttime light data" in the Yangtze River Delta.
1
—
—