highly significantp < 0.0001
After imputing missing studies in the funnel plot, adjustment of effect size for possible publication bias using the trim-and-fill correction results in decreased, albeit still highly significant estimate of pooled mean difference (adjusted = −0.36 logMAR; 95% CI: −0.44; −0.28; p < 0.0001).