close to significanceP = 0.055
In this subgroup, the functional shift was larger and close to significance ( n = 40, R 2 = 0.043, P = 0.055).
In this subgroup, the functional shift was larger and close to significance ( n = 40, R 2 = 0.043, P = 0.055).