almost reached significanceP = 0.07
This produced no significant results, even though Block almost reached significance, F (17,510) = 1.8, P = 0.07, indicating a trend towards less errors with practice (error percentages were always below 5%).
This produced no significant results, even though Block almost reached significance, F (17,510) = 1.8, P = 0.07, indicating a trend towards less errors with practice (error percentages were always below 5%).