highly significantP= 1.235e-07
The relative risk (RR 95%) of having a infection was highly significant: RR = 6,8 (3.314154 -13.95228) (P= 1.235e-07) and also neuroinfections RR = 4,76 (2.043019 - 11.09025) ( P = .00044478) if the child presented MMC wound CSF leakage before VP shunt insertion.