highly significantp < 0.01
Data analysis and results Data analysis Reliability and validity All of the factor loadings were highly significant ( p < 0.01) to their respective latent constructs; the composite reliabilities of all of the constructs were > 0.80; and all of the average variance extracted estimates were > 0.60 (Table 1 ; Fornell and Larcker, 1981 ).