The estimated change in HAZ for a 1% increase in the proportion of sick days was −0.002 (95% CI: [−0.004, 0.000]), while the estimate in WAZ was lower and borderline significant and the estimate in WHZ was negligible (WAZ change: −0.0002, WHZ change: −0.001).
← all excerpts
The Interaction between Morbidity and Nutritional Status among Children under Five Years Old in Cambodia: A Longitudinal Study.
1
—
—