The table shows all the indicators are highly significant with their loadings all above the required threshold ranging from 0.863 to 0.942 with the exception of T12 with the loading of 0.573.
← all excerpts
Occupational Health and Safety and Turnover Intention in the Ghanaian Power Industry: The Mediating Effect of Organizational Commitment.
1
—
—