Maximum uplifts at the left and right sides of the dam base are 11.3–20.2 mm and 2.5–9.5 mm, respectively, and reach a peak uplift of 60 mm at the downstream bedrocks, presenting an overall trend of greater upward movements at the left bank.
← all excerpts
Mechanism for large-scale canyon deformations due to filling of large reservoir of hydropower project.
1
—
—