The surrounding rock that is close to the EB may fail in 4.6 h on the condition that B = 1 and the creep duration on the SEDZ boundary was about 21.5 years, showing an increasing trend for the time-delayed failure duration in the SEDZ.
← all excerpts
Impact of Brittle Creep Failure on Time-Delayed Characteristics of Rockburst.
1
—
—