Following the initial three IBMs, two more resolutions were chosen to verify the previous relationship (e.g., 120-, 180 min, Figure S11 , blue). A clear trend is observed, with predictivity, R 2 test , decreasing logarithmically with increased monitoring resolution ( R 2 test = −0.1 ln(resolution; minutes) + 1.0298; R 2 = 0.9919).
← all excerpts
Real-Time Sensor Data Profile-Based Deep Learning Method Applied to Open Raceway Pond Microalgal Productivity Prediction.
1
—
—