failed to reach statistical significancep = 0.2171
In contrast to the performance assessment period, in the follow-up period, the difference was less pronounced and failed to reach statistical significance (39% vs 28%, p = 0.2171).
In contrast to the performance assessment period, in the follow-up period, the difference was less pronounced and failed to reach statistical significance (39% vs 28%, p = 0.2171).