Barely Significant
← all excerpts

Dam-Breach hydrology of the Johnstown flood of 1889-challenging the findings of the 1891 investigation report.

Heliyon · 2016 · PMC4946313 · PMID 27441292

1
hedged sentence
closest p
boldest claim

The sentences

probably not significantno p-value reported
One further insight from the hydrographs is that tailwater effects at the outlet were probably not significant, otherwise even more time would have been needed to drain the lake.

also in 246 other papers

Quoted from the open-access full text in Europe PMC under the licence the publisher applied. The sentence is reproduced exactly as published; the emphasis is ours.