As it can be seen in Table 2 , in the analyzed network with parameters given in Table 3 and topology shown in Figure 3 , the energy losses are quite significant, even though the electricity network has been modernized and in the entire locality a PLC (Power Line Communication) system is implemented.
← all excerpts
Smart Metering Systems Optimization for Non-Technical Losses Reduction and Consumption Recording Operation Improvement in Electricity Sector.
1
—
—