approached significancep = .068
The second step, with the remaining predictors, approached significance, R 2 = 0.154, F (5, 60) = 2.18, p = .068.
The second step, with the remaining predictors, approached significance, R 2 = 0.154, F (5, 60) = 2.18, p = .068.